Tsakhia Solar Park is a 100MW utility-scale solar project in Dundgobi province, part of Mongolia's 30% renewables target by 2030. The project includes a dedicated 110kV substation and 22km transmission line to the Central Grid.

BlockerNamkhai / Zoloo
Sector taxonomy is not yet finalized. The current sector tag ("Energy") uses the placeholder vocabulary. Final category list pending from CMM research team before v1 launch.
Key Metrics
Installed Capacity100 MW
Annual Generation180 GWh
Total CAPEX$92M
CommissioningQ3 2026
OfftakerCentral Grid (Mongolia)
PPA Term25 years
Sustainability
Sustainability Outcomes
Renewable energy generationClimate change mitigation
UN SDGs
SDG 7SDG 13
ESG PolicyYES
Sustainability DisclosureYES
Transition / Mitigation StrategyYES
Impact TrackedYES
Impact VerifiedYES
Certifications
IFC Performance Standards
Key Personnel
BM
B. Munkhzul
Project Director